Half Baked

Now that the main shapes are in place, it’s time to tow the U30C Phase 1 unit to the VRC shops in Chattanooga to finish out the details. It will be slow going with tons of nuts, bolts, hinges, grabs, switches, and levers to unwrap.

032515Blend1 Screenshot_Norfolk Southern Coal District_40.01160--79.92551_09-09-48